Approval Details

Valid E.O.

Validity

This Executive Order approved the specified parts on on October 7, 1997.
As of Wednesday, November 27th, 2024 this Executive Order has not been overturned or superceeded.

Approved Parts

Models
1995-1997 Mitsubishi Eclipse equipped with a 2.0L engine and a factory intercooler

This Executive Order may be listed as:
  • C.A.R.B.E.O. D-397-2
  • Executive Order 397-2 / D397-2
  • ARB # D-397-2
  • Executive Order No: D-397-2
  • C.A.R.B. No. D-397-2
  • Resolution D-397-2
For Free CARB Executive Order Status verification, email an image of the device Executive Order label as well as the Year/Make/Model and Test Group # of the vehicle to [email protected]

Download: Executive Order D-397-2 PDF

D-397-2 Document:


CARB_D-397-2

                                                                      (Page 1 of 2)

                                            State of California
                                      AIR RESOURCES BOARD


                                    EXECUTIVE ORDER D—397—2
                              Relating to Exemptions Under Section 27156
                                           of the Vehicle Code


                            GREDDY PERFORMANCE PRODUCTS, INC.
                              MITSUBISHI ECLIPSE INTERCOOLER


Pursuant to the authority vested in the Air Resources Board by Section 27156 of the Vehicle Code;
and

Pursuant to the authority vested in the undersigned by Section 39515 and Section 39516 of the Health
and Safety Code and Executive Order G—45—9;

IT IS ORDERED AND RESOLVED: That the installation of the GReddy Performance Products,
 Inc. (GReddy) Mitsubishi Eclipse Intercooler manufactured by Trust Company, Ltd. of 3155 Odai,
 Shibayama, Sanbu—gun, Chiba 289—16 Japan and marketed by GReddy Performance Products, Inc. of 9
 Vanderbilt, Irvine, CA 92618 has been found not to reduce the effectiveness of the applicable vehicle
 pollution control system and, therefore, is exempt from the prohibitions of Section 27156 of the
~Vehicle Code for installation on 1995 through 1997 2.0L Mitsubishi Eclipse models originally equipped
 with factory intercoolers.

This Executive Order is valid provided that the installation instructions for the GReddy Mitsubishi
Eclipse Intercooler will not recommend tuning the vehicle to specifications different from those
recommended by the vehicle manufacturer.

Changes made to the design or operating conditions of the GReddy Mitsubishi Eclipse Intercooler, as
exempt by the Air Resources Board, which adversely affect the performance of a vehicle‘s pollution
control system shall invalidate this executive order.

Marketing of the GReddy Mitsubishi Eclipse Intercooler using any identification other than that shown
in this Executive Order or marketing of the GReddy Mitsubishi Eclipse Intercooler for an application
other than those listed in this Executive Order shall be prohibited unless prior approval is obtained
from the Air Resources Board. Exemption of the GReddy Mitsubishi Eclipse Intercooler shall not be
construed as exemption to sell, offer for sale, or advertise any component of the kit as an individual
device.

This Executive Order does not constitute any opinion as to the effect that the use of the GReddy
 Mitsubishi Eclipse Intercooler may have on any warranty either expressed or implied by the vehicle
 manufacturer.


  GREDDY PERFORMANCE PRODUCTS, INC.                                     EXECUTIVE ORDER D—397—2
  MITSUBISHI ECLIPSE INTERCOOLER                                            (Page 2 of 2)


——~In addition to the foregoing, the Air Resources Board reserves the right in the future to review this
   executive Order and the exemption provided herein to ensure that the exempted add—on or modified
  part continues to meet the standards and procedures of Title 13, California Code of Regulations,
  Section 2222, et seq.

  THIS EXECUTIVE ORDER DOES NOT CONSTITUTE A CERTIFICATION, ACCREDITATION,
  APPROVAL, OR ANY OTHER TYPE OF ENDORSEMENT BY THE AIR RESOURCES
  BOARD OF ANY CLAIMS OF THE APPLICANT CONCERNING ANTI—POLLUTION BENEFITS
  OR ANY ALLEGED BENEFITS OF GREDDY PERFORMANCE PRODUCTS, INCS
  MITSUBISHI ECLIPSE INTERCOOLER.

  No claim of any kind, such as "Approved by the Air Resources Board" may be made with respect to
  the action taken herein in any advertising or other oral or written communication.

  Violation of any of the above conditions shall be grounds for revocation of this order. The order may
  be revoked only after ten day written notice of intention to revoke the order, in which period the
  holder of the order may request in writing a hearing to contest the proposed revocation. If a hearing
  is requested, it shall be held within ten days of receipt of the request and the order may not be
  revoked until a determination after hearing that grounds for revocation exist.

  Executed at El Monte, California, this     Zz       day of October 1997.




                                             fa R. B. Summerfield, Chief
                                                 Mobile Source Operations Division



Document Created: 2005-09-01 12:40:58
Document Modified: 2005-09-01 12:40:58

Previous E.O. D-397-1 | Previous E.O. D-396 | Next E.O. D-397-3 | Next E.O. D-398