Approval Details

Valid E.O.

Validity

This Executive Order approved the specified parts on on March 30, 2010.
As of Monday, October 21st, 2024 this Executive Order has not been overturned or superceeded.

Approved Parts

Part NumberModelsModification
259701994-1997 Ford 7.3L Power Stroke pickupsWithout EGR

This Executive Order may be listed as:
  • C.A.R.B.E.O. D-161-82
  • Executive Order 161-82 / D161-82
  • ARB # D-161-82
  • Executive Order No: D-161-82
  • C.A.R.B. No. D-161-82
  • Resolution D-161-82
For Free CARB Executive Order Status verification, email an image of the device Executive Order label as well as the Year/Make/Model and Test Group # of the vehicle to [email protected]

Download: Executive Order D-161-82 PDF

D-161-82 Document:


CARB_D-161-82

                                      State of California
                                  AIR RESOURCES BOARD

                                EXECUTIVE ORDER D—161—82

                          Relating to Exemptions Under Section 27156
                                    of the California Vehicle Code .

                                   Gale Banks Engineering
                                       Techni—Cooler

Pursuant to the authority vested in the Air Resources Board by Section 27156 of the
Vehicle Code; and                                                    .

Pursuant to the authority vested in the undersigned by Section 39515 and Section 39516
of the Health and Safety Code and Executive Order G—02—003;

IT 18 ORDERED AND RESOLVED: That the installation of the Techni—Cooler,
manufactured and marketed by Gale Banks Engineering, 546 Duggan Ave, Azusa,
California 91702, has been found not to reduce the effectiveness of the applicable
vehicle pollution control systems and, therefore, is exempt from the prohibitions of
Section 27156 of the Vehicle Code for the following vehicle applications not equipped
with exhaust gas recirculation.

Part Number                   Application                     .
25970     _           |       1994—1997 Ford 7.3L Power Stroke pickups

25971                         1999.5 Ford 7.3L Power Stroke pickups
25972                         1999 Ford 7.3L Power Stroke pickups
25973 _                       1999.5—2003 7.3L Power Stroké pickups

25976                         2001 GM LBT7 6.6L Duramax pickups

25980            '            2003—2005 Dodge 5.9L Cummins pickups

25981                         2006—2007 Dodge 5.9L Cummins pickups

Installation of the Techni—Cooler does not require any disconnection, relocation or
modification of the original temperature sensors. The engine‘s stock maximum intake
manifold (boost) pressure or fuel calibration must be retained.

This exemption is issued based on an engineering evaluatlon and information supplied
by Gale Banks Engineering.

This Executive Order is valid provided that the installation instructions for the
Techni—Cooler will not recommend tuning the vehicle to specifications different from
those submitted by the device manufacturer.


                                                  _7


   Changes made to the design or operating conditions of the Techni—Cooler, as exempt by
   the Air Resources Board, which adversely affect the performance of the vehicle‘s
   pollution control system shall invalidate this Executive Order

   Marketing of the Techni—Cooler using any identification other than that shown in this
   Executive Order or marketing of the Techni—Cooler for an application other than those
   listed in this Executive Order shall be prohibited unless prior approval is obtained from
   the Air Resources Board.

   This Executive Order does not constitute any opinion as to the effect the use of the
   Techni—Cooler may have on any warranty either expressed or implied by the vehicle
   manufacturer.

   THIS EXECUTIVE ORDER DOES NOT CONSTITUTE A CERTIFICATION,
   ACCREDITATION, APPROVAL, OR ANY OTHER TYPE OF ENDORSEMENT BY THE
   AIR RESOURCES BOARD OF ANY CLAIMS OF THE APPLICANT CONCERNING
   ANTI—POLLUTION BENEFITS OR ANY ALLEGED BENEFITS OF THE
   TECHNI—COOLER.

   No claim of any kind, such as "Approved by the Air Resources Board", may be made
   with respect to the action taken herein in any advertising or other oral or written '
   communication.

   Violation of any of the above conditions shall be grounds for revocation of this order.
   The order may be revoked only after a ten—day written notice of intention to revoke the
   order, in which period the holder of the order may request in writing a hearing to contest
   the proposed revocation. If a hearing is requested, it shall be held within ten days of
   receipt of the request and the order may not be revoked until a determination is made
   after the hearing that grounds for revocation exist.

   Executed at El Monte, California, this      3&7%      day of March 2010.



                                9& M/'
                                    7//Annette Hebert, Chief
                                            obile Source Operations Division




               GALE BANKS ENGINEERING — TECHNI—COOLER — D—161—82

remmiiiiiiiiiiiiiiiiiiiiiiiien



Document Created: 2010-07-29 10:33:30
Document Modified: 2010-07-29 10:33:30

Previous E.O. D-161-81 | Previous E.O. D-160 | Next E.O. D-161-83 | Next E.O. D-162