Approval Details

Valid E.O.

Validity

This Executive Order approved the specified parts on on November 1, 2013.
As of Monday, October 21st, 2024 this Executive Order has not been overturned or superceeded.

Approved Parts

Part Number
see pdf

This Executive Order may be listed as:
  • C.A.R.B.E.O. D-213-34
  • Executive Order 213-34 / D213-34
  • ARB # D-213-34
  • Executive Order No: D-213-34
  • C.A.R.B. No. D-213-34
  • Resolution D-213-34
For Free CARB Executive Order Status verification, email an image of the device Executive Order label as well as the Year/Make/Model and Test Group # of the vehicle to [email protected]

Download: Executive Order D-213-34 PDF

D-213-34 Document:


CARB_D-213-34

                                      State of California
                                 AlR RESOURCES BOARD

                               EXECUTIVE ORDER D—213—34

                        Relating to Exemptions Under Section 27156 |
                                    of the California Vehicle Code     .

                                  Vortech Engineering, Inc.
                                    Supercharger System

— Pursuant to the authority vested in the Air Resources Board by Section 27156 of the
 Vehicle Code; and

 Pursuant to the authority vested in the undersigned by Section 39515 and Section 39516
 of the Health and Safety Code and Executive Order G—02—003;

 IT I§ ORDERED AND RESOLVED: That the installation of the Supercharger System,
 manufactured and marketed by Vortech Engineering, Inc., 1650 Pacific Avenue, Oxnard,
 California 93033, has been found not to reduce the effectiveness of the applicable vehicle
 pollution control systems and therefore, is exempt from the prohibitions of Section 27156
 of the Vehicle Code for 2013 and 2014model year Subaru BRZ and Scion FR—S.

 The Supercharger System for the Subaru BRZ and Scion FR—S includes the following
 main parts: Centrifugal supercharger with a 3.47 inch diameter pulley, intercooler,
 supercharger by—pass valve, air intake tubing, mass air flow element housing, new air
 filter box with conical filter, and a ECU upgrade without user adjustments. The stock
 radiator thermostat, mass air flow sensor element, fuel injectors, 5.62 inch diameter
 crankshaft pulley, and fuel pump are retained. The PCV breather hose may be
 replaced or modified with an SAE30R9 rated hose or a Subaru or Scion replacement
 equivalent. All supplied fuel hosesare either Avon‘s CADbar 9000 series or a stock
 factory replacement, and fuel and vapor line connectors supplied with the kit are OEM
 equivalent parts. Maximum boost is 10 psi.

 This Executive Order is valid provided that the installation instructions for the Supercharger _
 System will not recommend tuning the vehicle to specifications different from those submitted
 by the device manufacturer

 Changes made to the design or operatlng condltlons of the Supercharger System, as exempt
 by the Air Resources Board, which adversely affect the performance of the vehicle‘s poIIutlon
 control system shall invalidate this Executive Order.  _

 This Executive Order shall not apply to any Supercharger System advertised, offered for sale,
 sold with, or installed on a new motor vehicle prlor to or concurrent with transfer to an ultlmate
 purchaser           '

 Marketing of the Supercharger System using any identification other than that shown in this
 Executive Order or marketing of the Supercharger System for an appllcatlon other than those:
 listed in this Executive Order shall be prohlblted unless prior approvalis obtained from the Air
 Resources Board.

— This Executive Order does not constitute any opinion. as to the effect the use of the °
  Supercharger System may have on any warranty either expressed or implied by the vehicle
  manufacturer.                                         .


                                                 3.


This Executive Order is granted based on emissions test data generated on one test vehicle
modified with the Supercharger System. Test results showed that emission levels, with the
supercharger kit installed, met the applicable emission standards when tested using the
Cold—Start CVS—75 Federal Test Procedure (FTP)test cycle and the Supplemental Federal
Test Procedure (SFTP) test cycle. Examination of the OBD II system showed that the
supercharger kit did not affect OBD II system operation. Results from emission testing
conducted at Quantum Technologies, located at Lake Forest, California, are shown below, in
grams per mile, with deterioration factors (df) applied to Cold—Start CVS—75 Federal Test
Procedure modified test results.

2013 model year Scion FR—S              CVS—75 FTP
                      '           NMOG     CO    NOx               HCHO
Standards, 5OK*                   0.075    34    0.05              0.015
Device Test w/idf                 0.023    0.6   0.03              0.001

                                         USO6/SCO3
                               NMHC+NOx          .CO
Standards 4k                     0.14/0.20       8.0/2.7
Device                           0.05/0.08       7.210.2

*LEV II LEV CVS—75 FTP emissions standards.

The Air Resources Board reserves the right in the future to review this Executive Order and
the exemption provided herein to assure that the exempted add—on or modified part continues
to meet the standards and procedures of Title 13, California Code of Regulations, Section
2323, et seq.

THIS EXECUTIVE ORDER DOES NOT CONSTITUTE A CERTIFICATION,
ACCREDITATION, APPROVAL, OR ANY OTHER TYPE OF ENDORSEMENT BY THE AIR
RESOURCES BOARD OF ANY CLAIMS OF THE APPLICANT CONCERNING
ANTI—POLLUTION BENEFITS OR ANY ALLEGED BENEFITS OF THE SUPERCHARGER
SYSTEM.

No claim of any kind, such as "Approved by the Air Resources Board", may be made with
respect to the action taken herein in any advertising or other oral or written communication.

Violation of any of the above conditions shall be grounds for revocation of this order. The
order may be revoked only after a ten—day written notice of intention to revoke the order, in
which period the holder of the order may request in writing a hearing to contest the proposed
revocation. If a hearing is requested, it shall be held within ten days of receipt of the request
and the order may not be revoked until a determination is made after the hearing that grounds
for revocation exist.

Executed at El Monte, California, this       Z s       day of November 2013.




                                         k   White, Chief
                                    Mobile Source Operations Division

        VORTECH ENGINEERING, INC. — SUPERCHARGER SYSTEM — D—213—34



Document Created: 2014-02-04 15:43:35
Document Modified: 2014-02-04 15:43:35

Previous E.O. D-213-33 | Previous E.O. D-212 | Next E.O. D-213-35 | Next E.O. D-214