Approval Details

Valid E.O.

Validity

This Executive Order approved the specified parts on on September 12, 2014.
As of Monday, October 21st, 2024 this Executive Order has not been overturned or superceeded.

Approved Parts

Part Number
see pdf

This Executive Order may be listed as:
  • C.A.R.B.E.O. D-215-86
  • Executive Order 215-86 / D215-86
  • ARB # D-215-86
  • Executive Order No: D-215-86
  • C.A.R.B. No. D-215-86
  • Resolution D-215-86
For Free CARB Executive Order Status verification, email an image of the device Executive Order label as well as the Year/Make/Model and Test Group # of the vehicle to [email protected]

Download: Executive Order D-215-86 PDF

D-215-86 Document:


CARB_D-215-86

                                    State of California
                                AIR RESOURCES BOARD

                              EXECUTIVE ORDER D—215—86

                       Relating to Exemptions Under Section 27156
                                  of the California Vehicle Code

                                Edelbrock Corporation
     E—Force Supercharger Kit, P/Ns 1570, 1571, 15700, 15701, 15710, and 15711

Pursuant to the authority vested in the Air Resources Board by Section 27156 of the
Vehicle Code; and

Pursuant to the authority vested in the undersigned by Section 39515 and Section 39516
of the Health and Safety Code and Executive Order G—14—012;

IT IS ORDERED AND RESOLVED: That the installation of the E—Force Supercharger
Kit, manufactured and marketed by the Edelbrock Corporation, 2700 California Street,
Torrance, California 90509, has been found not to reduce the effectiveness of the
applicable vehicle pollution control systems and, therefore, is exempt from the
prohibitions of Section 27156 of the Vehicle Code for the 2014 model year Chevrolet
Corvette.

The E—Force Supercharger Kit consists of the following main components: Eaton
TVS R2300 supercharger, intake manifold, bypass valve, intercooler, intake tubing, new
crankshaft pulley (same diameter as stock), high flow air filter cartridge, and a reflashed
ECM using an Edelbrock supplied handheld tuner, part nos. 15700 and 15710 include
the Edelbrock reflash but not the handheld tuner. The throttle body, mass air flow
sensor, air filter box, and radiator thermostat are retained. Supercharger pulley
diameters are either 3.25" or 3.5". Maximum boost pressure is 7.5 psi. The tuner‘s
emission—related data files cannot be modified by the end user. All supplied fuel hoses
are Avon‘s CADbar 9000 series, and fuel and vapor line connectors supplied with the kit
are OEM — equivalent parts. Breather hoses may be replaced with an SAE30RY rated
hose.

This Executive Order is valid provided that the installation instructions for the E—Force
Supercharger Kit will not recommend tuning the vehicle to specifications different from
those of the kit manufacturer.

Changes made to the design or operating conditions of the E—Force Supercharger Kit, as
exempt by the Air Resources Board, which adversely affect the performance of the
vehicle‘s pollution control system shall invalidate this Executive Order.

This Executive Order shall not apply to any E—Force Supercharger Kit advertised, offered
for sale, sold with, or installed on a new motor vehicle prior to or concurrent with transfer to
an ultimate purchaser.

Marketing of the E—Force Supercharger Kit using any identification other than that shown in
this Executive Order or marketing of the E—Force Supercharger Kit for an application other
than those listed in this Executive Order shall be prohibited unless prior approval is
obtained from the Air Resources Board.


                                              §3

This Executive Order does not constitute any opinion as to the effect the use of the
E—Force Supercharger Kit may have on any warranty either expressed or implied by the
vehicle manufacturer.

This Executive Order is granted based on prior submitted emission test data generated on
five test vehicles modified with the E—Force Supercharger Kit. Test results showed that
emission levels, with the supercharger kit installed, met the applicable emission standards
when tested using the Cold—Start CVS—75 Federal Test Procedure (FTP) test cycle and the
Supplemental Federal Test Procedure (SFTP) test cycle. Examination of the OBD II
system showed that the supercharger kit did not affect OBD II system operation. Edelbrock
submitted new emissions test data generated on a 2014 model year Chevrolet Corvette.
Test results showed that emission levels, with the supercharger kit installed, met the
applicable emission standards when tested using the SFTP test cycle. Examination of the
OBD II system showed that the supercharger kit did not affect OBD II system operation.
Results from emissions testing conducted at the Auto Club Emissions Laboratory, located
in Diamond Bar, California, are shown below (in grams per mile).

                                     USO6/SCO3
                               NMHC+NOx              Co
   Standards 4k                  0.14/0.20           8.0/2.7
   Device                        0.05/0.04           0.3/0.6

The Air Resources Board reserves the right in the future to review this Executive Order and
the exemption provided herein to assure that the exempted add—on or modified part
continues to meet the standards and procedures of Title 13, California Code of
Regulations, Section 2222, et seq.

THIS EXECUTIVE ORDER DOES NOT CONSTITUTE A CERTIFICATION,
ACCREDITATION, APPROVAL, OR ANY OTHER TYPE OF ENDORSEMENT BY THE
AIR RESOURCES BOARD OF ANY CLAIMS OF THE APPLICANT CONCERNING
ANTI—POLLUTION BENEFITS OR ANY ALLEGED BENEFITS OF THE E—FORCE
SUPERCHARGER KIT.

No claim of any kind, such as "Approved by the Air Resources Board", may be made with
respect to the action taken herein in any advertising or other oral or written communication.

Violation of any of the above conditions shall be grounds for revocation of this order. The
order may be revoked only after a ten—day written notice of intention to revoke the order, in
which period the holder of the order may request in writing a hearing to contest the
proposed revocation. If a hearing is requested, it shall be held within ten days of receipt of
the request and the order may not be revoked until a determination is made after the
hearing that grounds for revocation exist.

Executed at El Monte, Callforma this & day of September 2014.



                  mfi%fié\
                      Annette Hebert, Chief
                      Emissions Compllance Automotive Regulations and Science Division

               EDELBROCK — E—FORCE SUPERCHARGER KIT — D—215—86



Document Created: 2014-09-15 16:40:04
Document Modified: 2014-09-15 16:40:04

Previous E.O. D-215-85 | Previous E.O. D-214 | Next E.O. D-215-87 | Next E.O. D-216