Approval Details

Valid E.O.

Validity

This Executive Order approved the specified parts on on April 16, 2003.
As of Saturday, November 30th, 2024 this Executive Order has not been overturned or superceeded.

Approved Parts

ModelsModification
2003 and older vehiclesreplacement ignition wires

This Executive Order may be listed as:
  • C.A.R.B.E.O. D-414-10
  • Executive Order 414-10 / D414-10
  • ARB # D-414-10
  • Executive Order No: D-414-10
  • C.A.R.B. No. D-414-10
  • Resolution D-414-10
For Free CARB Executive Order Status verification, email an image of the device Executive Order label as well as the Year/Make/Model and Test Group # of the vehicle to [email protected]

Download: Executive Order D-414-10 PDF

D-414-10 Document:


CARB_D-414-10

                                               State of California
                                           AIR RESOURCES BOARD
_omnis




                                         EXECUTIVE ORDER D—414—10

                                  Relating to Exemptions Under Section 27156
                                               of the Vehicle Code


                                         NOLOGY ENGINEERING, INC.
                                               HOTWIRES


         Pursuant to the authority vested in the Air Resources Board by Section 27156 of the Vehicle
         Code; and                             |

         Pursuant to the authority vested in the undersigned by Section 39515 and Section 39516 of
         the Health and Safety Code and Executive Order G—02—003;

         IT IS ORDERED AND RESOLVED: That the installation of the HotWires manufactured and
         marketed by Nology Engineering, Inc. of 1945 S. Rancho Santa Fe Road, San Marcos,
         California 92069 has been found not to reduce the effectiveness of required motor vehicle
         pollution control devices and, therefore, is exempt from the prohibitions of Section 27156 of
         the California Vehicle Code for installation on 2003 and older model—year vehicles equipped
         with spark ignited engines.

         Changes to the factory emission control systems are limited to replacing the original
         equipment manufacturer (OEM) spark plug wires with Nology Engineering, Inc.‘s HotWires.

         This Executive Order shall not apply to any Nology Engineering, Inc. HotWires advertised,
         offered for sale, sold with, or installed on a new motor vehicle prior to or concurrent with
         transfer to an ultimate purchaser.

         This Executive Order is valid provided that the installation instructions for the HotWires will
         not recommend tuning the vehicle to specifications different from those submitted by the
         device manufacturer.

         Changes made to the design or operating conditions of the device, as exempted by the Air
         Resources Board (ARB), that adversely affect the performance of a vehicle‘s pollution control
         system shall invalidate this Executive Order.

         Marketing of this device using any identification other than that shown in this Executive Order
         or marketing of this device for an application other than those listed in this
         Executive Order.shall be prohibited unless prior approval is obtained from the ARB.

         This Executive Order does not constitute any opihion as to the effect the use of this device
         may have on any warranty either expressed or implied by the vehicle manufacturer.




                           wike


                                               2.


This exemption is issued based on information submitted by the manufacturer, which showed
that the HotWires meet the requirements of compliance criteria for ignition system
components as specified under the "Procedures for Exemption of Add—On and Modified
Parts" and therefore, will not increase emissions. This Executive Order is also based on
previous On—Board Diagnostic II (OBD II) testing. Testing showed that the HotWires when
installed on the vehicle did not affect the vehicle‘s ability to perform its OBD 1I monitoring.

THIS EXECUTIVE ORDER DOES NOT CONSTITUTE A CERTIFICATION,
ACCREDITATION, APPROVAL, OR ANY OTHER TYPE OF ENDORSEMENT BYTHEAIR_________
RESOURCES BOARD OF ANY CLAIMS OF THE APPLICANT CONCERNING
ANTI—POLLUTION BENEFITS OR ANY ALLEGED BENEFITS OF NOLOGY ENG!NEERING
INC.‘S HOTWIRES.  _

No claims of any kind, such as "Approved by the Air Resources Board" may be made with
respect to the action taken herein in any advertising or other oral or written communication.

Violation of any of the above conditions shall be grounds for revocation of this order. The
order may be revoked only after ten day written notice of intention to revoke the order, in
which period the holder of the order may request in writing a hearing to contest the proposed
revocation. If a hearing is requested, it shall be held within ten days of receipt of the request
and the order may not be revoked until a determination is made after the hearing that
grounds for revocation exist.

Executed at El Monte, California, this    (@fl’/ day of April 2003.




                                         Allga%yons, Chief
                                         Mobile Source Operations Division




                       NOLOGY ENGINEERING, INC.—HOTWIRES—D—414—10




                  =*



Document Created: 2005-09-01 12:43:04
Document Modified: 2005-09-01 12:43:04

Previous E.O. D-414-9 | Previous E.O. D-413 | Next E.O. D-414-11 | Next E.O. D-415