Approval Details

Valid E.O.

Validity

This Executive Order approved the specified parts on on April 26, 2013.
As of Monday, October 21st, 2024 this Executive Order has not been overturned or superceeded.

Approved Parts

Part NumberModelsModification
see pdfsee pdfsee pdf

This Executive Order may be listed as:
  • C.A.R.B.E.O. D-707
  • Executive Order 707 / D707
  • ARB # D-707
  • Executive Order No: D-707
  • C.A.R.B. No. D-707
  • Resolution D-707
For Free CARB Executive Order Status verification, email an image of the device Executive Order label as well as the Year/Make/Model and Test Group # of the vehicle to [email protected]

Download: Executive Order D-707 PDF

D-707 Document:


CARB_D-707

                                       State of California
                                   AIR RESOURCES BOARD 4

                                   EXECUTIVE ORDER D—707

                           Relatmg to Exemptlons Under Sectlon 217156
                                      of the California Vehlcle Code

                               A&A Corvette Performance Ltd
                           _ A&A Corvette Performance Supercharger _

  Pursuanf to the aut‘hbrity' vested in the Air Resources Board by S_ection 27156 ef the
  Vehicle Code; and                                      .                                .

  Pursuant to the authorify vested ih the undersigned by Section 39515 énd Section 39516
  of the Health and Safety Code and Executive Order G—02—003; —

  IT IS ORDERED AND RESOLVED: That the installation of the A&A Corvette
  Performance Supercharger, manufactured and marketed by A&A Corvette Performance
  Ltd., 477 Lambert Street, Unit A, Oxnard, Callfornra 93036, has been found not to reduce
 \the effectlveness of the applicable vehrcle pollution control systems and, therefore, is
  exempt from the prohibitions of Section 27156 of the Vehicle Code for the followmg 1997 ~ .
  to 2013 model year Chevrolet Corvettes:                      &

  Model Year       Engine Displacement_                      Kit Part Number .. SC Pulley Diameter _

  1997   to   2000 — _ . §.7L                   >              AA—9700          22          3.8".
  2001   to   2004     — S5.7ZL                  .            AA—0104                       3.8"
  2005   to   2007       6.0L           .                      AA—0507                    ~4.0"
  2008   to   2013 _     6.2L               ~                  AA—0812 .             o_     4.0"
  2006   to   2013 C     7.0L       |                :         AA—06122 .               200 4.0"

  The A&A Corvette Performance Supercharger consrsts of the followrng main          _
_ _components: Vortech V2SI centrifugal supercharger with either a 3.8 or 4.0 inch
  diameter pulley using the stock 7.25 inch diameter crankshaft pulley, intercooler,
  supercharger by—pass valve, air filter and plastic inlet duct (2008 and newer Corvette
  applications use the General Motors Corvette carbon adsorber pad in inlet duct) , ECU
  upgrade without user adjustments, replacement high flow fuel injectors, crankshaft
  pinning kit, and voltage booster for factory fuel pump. The stock radiator thermostat is .
  retained and nochanges are made to any fuel hose. The PCV breather hose may be
_ replaced or modified with an SAE30R9 rated hose or a General Motors replacement
  equivalent. Maximum boost is 7 psi. '                                   —

   This Executive Order is valid provided that the installation instructions for the A&A
 : Corvette Performance Supercharger will not recommend tuning the vehicle to
  specifications. different from those of the kit manufacturer.

  Changes made to the design or operating conditions of the A&A Corvette Performance
  Supercharger, as exempt by the Air Resources Board, which adversely affect the
  performance of the vehlclespollution control system shall invalidate this Executive .
  ‘Order.


This Executive Order is granted based on submitted emission test data generated on one
test vehicle modified with the A&A Corvette Performance Supercharger. Test results
showed that emission levels, with the supercharger kit installed, met the applicable
emission standards when tested using the Cold—Start CVS—75 Federal Test Procedure
(FTP) test cycle and the Supplemental Federal Test Procedure (SFTP USO6/SC03) test
cycle. Examination of the OBD II system showed that the supercharger kit did not affect
OBD II system operation. Results from emissions testing conducted at Quantum
Technologies, located at Lake Forest, California, are shown below, in grams per mile, with
deterioration factors (df) applied.

2012 model year 6.2L Corvette                     CVS—75 FTP
                                   NMOG       CO     .NOx           HCHO
Standards, Useful Life             0.070      2.1     0.04          0.011
Device Test w/df                   0.034      1.0     0.02          0:000

                                          USO6/SC03
                                NMHC+NOx          CO
Standards 4k                      0.14/0.20       8.0/2.7
Device                            0.05/0.01       1.0/0.6

The Air Resources Board reserves the right in the future to review this Executive Order and
the exemption provided herein to assure that the exempted add—on or modified part
continues to meet the standards and procedures of Title 13, California Code of
Regulations, Section 2222, et seq.

THIS EXECUTIVE ORDER DOES NOT CONSTITUTE A CERTIFICATION,
ACCREDITATION, APPROVAL, OR ANY OTHER TYPE OF ENDORSEMENT BY THE
AIR RESOURCES BOARD OF ANY CLAIMS OF THE APPLICANT CONCERNING
ANTI—POLLUTION BENEFITS OR ANY ALLEGED BENEFITS OF THE A&A¥ CORVETTE
PERFORMANCE SUPERCHARGER.

This Executive Order shall not apply to any A&A Corvette Performance Supercharger
advertised, offered for sale, sold with, or installed on a new motor vehicle prior to or
concurrent with transfer to an ultimate purchaser.              |

Marketing of the A&A Corvette Performance Supercharger using any identification other
than that shown in this Executive Order or marketing of the A&A Corveftte Performance
Supercharger for an application other than those listed in this Executive Order shall be
prohibited unless prior approval is obtained from the Air Resources Board.

No claim of any kind, such as "Approved by the Air Resources Board", may be made with
respect to the action taken herein in any advertising or other oral or written communication.




    A&A CORVETTE PERFORMANCE LTD.—CORVETTE SUPERCHARGER —D—707


Violation of any of the above conditions shall be grounds for revocation of this order. The
order may be revoked only after a ten—day written notice of intention to revoke the order, in
which period the holder of the order may request in writing a hearing to contestthe
proposed revocation. If a hearing is requested, it shall be held within ten days of receipt of
the request and the order may not be revoked until a determination is made after the
hearing that grounds for revocation exist. .

Executed at El Monte, California, this    web 4 day of April 2013.




                                  Erik White, Chief .
                                %obile Source Operations Division




   ‘A&A CORVETTE PERFORMANCE LTD.—CORVETTE SUPERCHARGER —D—707





Document Created: 2013-07-23 17:22:16
Document Modified: 2013-07-23 17:22:16

| Previous E.O. D-706 | Next E.O. D-707-1 | Next E.O. D-708