Approval Details

Valid E.O.

Validity

This Executive Order approved the specified parts on on July 8, 2008.
As of Wednesday, February 5th, 2025 this Executive Order has not been overturned or superceeded.

Approved Parts

Part NumberModels
see pdfsee pdf

This Executive Order may be listed as:
  • C.A.R.B.E.O. D-418-13
  • Executive Order 418-13 / D418-13
  • ARB # D-418-13
  • Executive Order No: D-418-13
  • C.A.R.B. No. D-418-13
  • Resolution D-418-13
For Free CARB Executive Order Status verification, email an image of the device Executive Order label as well as the Year/Make/Model and Test Group # of the vehicle to [email protected]

Download: Executive Order D-418-13 PDF

D-418-13 Document:


CARB_D-418-13

                                         State of California
                                     AIR RESOURCES BOARD

C                                  EXECUTIVE ORDER D—418—13

                            Relating to Exemptions Under Section 27156
                                       of the California Vehicle Code

                                           Roush Industries
                                         ROUSHCharger Kit

     Pursuant to the authority vested in the Air Resources Board by Section 27156 of the
     Vehicle Code; and                                                                   |

    — Pursuant to the authority vested in the undersigned by Section 39515 and Section
    39516 of the Health gnd Safety Code and Executive Order G—02—003;

     IT IS ORDERED AND RESOLVED: That the installation of the ROUSHCharger Kit,
     produced and marketed by Roush Industries of 777 Republic Drive, Allen Park,
     Michigan 48101, has been found not to reduce the effectiveness of the applicable
     vehicle pollution control systems and, therefore, is exempt from the prohibitions of
     Section 27156 of the Vehicle Code for the 2005 through 2009 model year 4.6L Ford
     Mustangs.

     The ROUSHCharger Kit for the Ford Mustang (part numbers RO7O00030 and
     RO7000031) includes a roots type axial flow supercharger assembly, intercooler, intake
     manifold, high flow fuel injectors, recalibrated stock mass air flow sensor, and a new
     fuel calibration modified to operate with the supercharger. The Roush Industries
     ROUSHCharger Kit utilizes either a 73 or 76 mm diameter pulley. Maximum boost
     produced by the supercharger would be either 4.8 or 5.3 pounds per square inch. The
     stock air filter housing, crankshaft pulley, and radiator thermostat is retained.

     This Executive Order is valid provided that the installation instructions for the
     ROUSHCharger Kit will not recommend tuning the vehicle to specifications different
     from those of the vehicle manufacturer.

      Changes made to the design or operating conditions of the ROUSHCharger Kit, as
      exempt by the Air Resources Board, which adversely affect the performance of the
      vehicle‘s pollution control system shall invalidate this Executive Order.

      This Executive Ordershall not apply to any ROUSHCharger Kit advertised, offered for
      sale, sold with, or installed on a new motor vehicle prior to or concurrent with transfer to
      an ultimate purchaser.

      Marketing of the ROUSHCharger Kit using any identification other than that shown in
      this Executive Order or marketing of the ROUSHCharger Kit for an application other
      than those listed in this Executive Order shall be prohibited unless prior approvalis
      obtained from the Air Resources Board.


                                              7.


This Executive Order does not constitute any opinion as to the effect the use of the
ROUSHCharger Kit units may have on any warranty either expressed or implied by the
vehicle manufacturer.

This Executive Order is granted based on submitted emission test data submitted by
Roush Industries in certifying their Stage 3 supercharged Mustang (engine family
9RIIVO4L.GVBB, LEV II ULEV, PC). The final configuration of the ROUSHCharger is the
same as the Stage 3. The certification emission results are shown below in grams per
mile:

Mustang

50k / Useful Life    | NMOG        CO         NOx       HCHO
Emission Level      —0.036/0.039 —1.5/1.6   0.04/0.05      n/a
(w. DF applied)

     STD     _      0.040/0.055   1.7/2.1 ©0.05/0.07    0.008/0.011


  USO6/SCO3         NMHC+NOx       CO
Emission Level       0.02/0.07    2.0/2.0

     STD             0.14/0.20    8.0/2.7 .

The certification emission test results submitted for new vehicle certification have been
accepted as representative of emissions in the modified configuration. The certification
emission test results were below the applicable certifitation standards. Examination of
the OBD II system was not performed since Roush Industries has demonstrated OBD |I
compliance during certification of the Stage 3 supercharged Mustang. Therefore, based _
on the test results, the staff concludes that the Roush Industries‘ ROUSHCharger Kit
meets the criteria for exempting general criteria parts.

The Air Resources Board reserves the right in the future to. review this Executive Order
and the exemption provided herein to assure that the exempted add—on or modified part
continues to meet the standards and procedures of Title 13, California Code of
Regulations, Section 2222, et seq.

THIS EXECUTIVE ORDER DOES NOT CONSTITUTE A CERTIFICATION,
ACCREDITATION, APPROVAL, OR ANY OTHER TYPE OF ENDORSEMENT BY THE
AIR RESOURCES BOARD OF ANY CLAIMS OF THE APPLICANT CONCERNING
ANTI—POLLUTION BENEFITS OR ANY ALLEGED BENEFITS OF ROUSH
INDUSTRIES®‘ ROUSHCHARGER KIT.

No claim of any kind, such as "Approved by the Air Resources Board", may be made
with respect to the action taken herein in any advertising or other oral or written
communication.




         ROUSH INDUSTRIES — ROUSHCHARGER KIT =D—418—13


e    Violation of any of the above conditions shall be grounds for revocation of this order.
\J   The order may be revoked only after a ten—day written notice of intention to revoke the
     order, in which period the holder of the order may request in writing a hearing to contest
     the proposed revocation. If a hearing is requested, it shall be held within ten days of
     receipt of the request and the order may not be revoked until a determination is made
     after the hearing that grounds for revocation exist.

     Executed at El Monte, California, this    g         day of July 2008




                                     Annette Hebert, Chief
                                     Mobile Source Operations Division




               ROUSH INDUSTRIES — ROUSHCHARGER KIT — D—418—13



Document Created: 2014-05-15 11:09:16
Document Modified: 2014-05-15 11:09:16

Previous E.O. D-418-12 | Previous E.O. D-417 | Next E.O. D-418-14 | Next E.O. D-419